Acceptance Inspection Request Flow
Responds to inspection after delivery of contracted work. A delivery note PDF is automatically generated from the information input at [1. Delivery information input] and sent. In the [2. Correspond Acceptance/Receiving Acceptance report] Step there are 4 correspondence patterns available; a: receipt of acceptance report / b: deemed inspection passed / c: extend acceptance deadline / d: abandon delivery acceptance.
Download
- Acceptance_Inspection_Request_flow.qar (Latest)
- acceptance-inspection-request-flow-20170612-220-en.qar
Only available for Professional edition.
Notes
- You need to associate the Swimlane settings according to your organizational structure upon import
- For practical use, please change the fixed values that have been set
- The Initial Value in the Data Item “Footer message”
- Company name set in the body of the [Throwing Message Intermediate Event (email)]
- Tax rate set in the Expression in the Data Item “Tax, etc.”
- Fixed part of the company name in the base PDF (add-on) * Acrobat required
See also
- Scenario: Episode 539: A Step to be Considered as “Received” when the Time Comes
- Settings Required When Importing an Archive
- Manual: M202: Set the Deadline for Each Step
- Manual: M203: Parallel, Single Split and Multiple Split
- Manual: M228: Auto Generating a PDF File with Business Data Inserted
- Reference: R2030: Type of Conditional Expression
- Reference: R2271: Output of Date and Datetime Data via EL syntax
- Reference: R2280: Business Data Insertion IDs (PDF)
- Blog: Your first step of Questetra BPM Suite / Chpt.4: Splitting by Condition

